Ministry of Road Transport & Highways
Road Projects in Telangana
Posted On: 12 MAR 2018 5:51PM by PIB Delhi
Twenty projects covering length of 866 Km amounting to Rs.5972 Cr have been sanctioned and are in progress in the state of Telangana. An expenditure of Rs.1350 Cr has been incurred on these projects so far. The details are shown in the table below. Besides 12 projects in a length of 392 Km amounting to Rs. 4675 Cr have been sanctioned in 2017-18 and are in tender stage. The projects are generally to be completed within twenty four months from the date of start.
Sr.
No.
Name of the Project
NH No.
Length (km)
Estimates Total Project Cost
(Rs. Crores)
Expenditure (Rs. Crores)
1
Rehabilitation and upgradation of NH -565 from km 1.00 to 86.057 (Nakrekal to Nagarjunsagar Dam section) to two-lanes with paved shoulders under NHDP-IV on EPC basis.
565
85.06
270.00
102.45
2
Rehabilitation and upgradation of NH-221 from km 71/2 to 121/0 (of Vijayawada-Jagdalpur AP Border to Rudrampur) under NHDP-IV.
221
49.38
244.30
162.48
3
Rehabilitation and upgradation of NH-221 from km 121/0 to 165/00 (of Vijayawada-JagdalpurRudrampur to Sarapaka) under NHDP-IV.
221
43.19
334.82
88.67
4
Rehabilitation and upgradation to Two lane with Paved Shoulders from Km 0/0 to 72/6 of NH-365 (Nakrekal to Thanamcherla section) in the State of Telangana under NHDP-IV on EPC basis.
365
66.56
605.08
64.53
5
Construction of HLB across river Godavari at km 166/0 of NH 221 on EPC mode.
30
2.3
98.45
28.122
6
Four Laning from Km 4/8 to 24/6 of Nizamabad-Jagdalpur section of NH-63 (Old NH-16) in the State of Telangana under NH(O) on EPC mode .
63
19.00
117.56
19.093
7
Widening existing 2 lane to 2 lane with paved shoulders in km 67/2 to 109/0 including intermediate lanes of NH 363.
363
41.36
153.21
86.590
8
Widening &Strenthening of existing 2 lane carrige way on Hyderabad -Tokapalli section of NH 765 from km 108/8 to 128/6 including construction of new HL B Major at km 109/745 & construction of 4 new HLB minor at km 109/360,km 111/150, km 111/335 & km 111/405 and its approches.
765
19.80
77.26
57.796
9
Widening &Strenthening of NH 167 from km 227/6 to 283/0.
167
55.40
127.24
51.608
10
Widening to two/four lane with Paved Shoulders from existing Km 182.120 to Km 227.600 of NH-167 on Haggiri-Jadcherla road in the State of Telangana on EPC mode.
167
45.92
298.32
18.857
11
Widening to two/four lane with Paved Shoulders from existing Km 180.60 to Km 223.00 of NH-63 on Nizamabad-Jagadalpur road in the State of Telangana on EPC mode.
63
42.40
248.83
21.883
12
Widening to two lane with paved shoulders from Km 40/410 to Km 84/037of Thirumalagiri to Suryapet section of NH-365B.
365B
43.89
244.54
13.589
13
Widening to two lane with paved shoulders from Km 0/970 to Km 40/410 of Janagaon-Thirumalagiri of NH-365B.
365B
39.18
196.52
0.577
14
Widening to two lane with paved shoulders from Km 15.525 to Km 62.880 of Jadcherla-Kalwakurthy section of NH-167.
167
47.355
283.00
0.129
15
Widening to two lane with paved shoulders from Km 59.500 to Km 132.033 of Manneguda-Ravulapallysecttion of NH-163.
163
72.53
359.27
13.448
16
Widening to two lane with paved shoulders from Km 67.00 to 114.425 of Kalwakurthy-Mallepally section of NH-167.
167
47.005
300.00
13.502
17
Improvement from Km 493/0 to 524/0 of Pune-Hyderabad section of NH-65 (Old NH-9).
65
31
48.22
14.56
18
Development of Missing Link from Km 0.00 to 3.240 of Kalyan-Nirmal road of NH-61 in Nirmal town.
61
3.24
25.91
2.735
19
Widening to two lane with paved shoulder from Km 125/242 to 137/604 of NH-150 on Kalaburgi-Yadgiri-Krishna road.
150
12.24
34.76
0
20
Four-Laning of Yadgiri –Warangal Section of NH-163 (Old NH-202) from Km 54/0 to Km 150/0 (Design Length 99.103 km).
163
99.103
1905.23
589.37
Total
866
5972
1350
This information was given by the Minister of State for Road Transport and Highways Shri MansukhlalMandavia in a written reply to a question in Rajya Sabha today.
****
Source: PIB
Post a Comment